Our integrated planners deliver end-to-end planning, critical path, phasing, cost optimisation and safe parallel execution for high-value warehouse automation. Built to hold up at a billion in CAPEX.
To nail the plan,
you need a plan.
On a nine-figure build, the schedule is the program. A missed sequence between material handling, controls and fit-out doesn't read as a line item. It reads as acceleration cost, idle crews, rework and a slipped go-live. Most of it is decided in planning, long before anyone hits the floor.
Natively built apps to plan, understand and visualise your program, wired into the software you already run, with AI agents trained on real builds.
Planning, visualisation and reporting apps built for how your program actually runs: critical path, phasing, laydown, S-curve forecasting and issue tracking.
Seamless with MS Project, Primavera P6 and the rest of your stack. Your schedule stays where it lives; the tools read and write to it directly.
Agents trained on hundreds of real schedules and models, so the guidance is grounded in how programs like yours behave, not generic theory.
Our integrated planners build one model carrying schedule, cost and safety together, in MS Project with multi-team critical path and the custom tooling to keep it honest.
Full schedule from design through commissioning, with multi-team critical path across general contracting, material handling, controls, IT, fit-out and safety.
The tasks that actually drive your date, the float hiding risk, and the constraints worth attacking first.
Area-by-area sequencing and laydown management so trades aren't fighting for the same floor at the same time.
Mapping where high-risk works overlap in space and time, then resequencing to remove unsafe concurrency before the floor.
Cutting spend that bad sequencing creates: acceleration, standing crews, double handling, avoidable rework.
Adaptive SPI forecasting, slippage tracking and reporting your leadership and client can act on directly.
Every program is a set of systems coming online in the right order. Our integrated planners sequence the integration, commissioning and tie-in of the technology itself, across greenfield and retrofit.
High-speed conveyor and sortation lines planned around install sequence, commissioning windows and live tie-ins.
Automated guided vehicles and autonomous mobile robots, with charging, traffic and safety zones sequenced against civil and fit-out.
Robotic arms, goods-to-person and palletising cells planned through integration, calibration and ramp.
AI-driven and autonomous systems planned around data, sensors and the safety validation they need before go-live.
Emerging humanoid deployments scoped into the program and its infrastructure as the technology reaches the floor.
Structured cabling, network and controls backbone sequenced so every system has power and data on time.
Agents that read your schedule like our integrated planners do, run scenarios faster than a person can, and surface the call before the date is already gone.
Ingest MS Project XML, reconcile baseline versus actuals, flag what changed between revisions down to the package.
Adaptive SPI and Monte Carlo give a probable go-live with a confidence range, not a single optimistic number.
Continuous slippage detection on critical and near-critical paths, so a two-week drift surfaces while it's recoverable.
Test resequencing, added crews or a rebaseline against cost and date before committing a single euro.
Hand the agent any baselined plan. It tracks progress, refreshes the forecast and flags drift on every update, straight through to handover.
Every decision data-driven.
You know how your project did, does, and will do.
The tools our integrated planners run on every engagement: the schedule as a live Gantt, the floor as a layered laydown, and progress as an S-curve with an AI agent tracking any baselined plan to completion. Click around.
A go-live you can commit to, because the critical path behind it is real.
Spend removed before it happens, not explained after.
Risk surfaced while it's recoverable, not at the milestone review.
Parallel high-risk works designed out of the sequence, not managed on the day.
Read the current schedule, find where the date is really set and where risk hides.
Rebuild critical path, phasing and laydown into one model carrying cost and safety.
Resequence to pull the date, cut spend and clear unsafe concurrency, tested before committing.
Forecasting and reporting that keep the plan honest through to go-live.
Our integrated planners run program-level planning for large warehouse automation builds, backed by 10+ years of general contracting: critical path, phasing, laydown, cost and safety sequencing, plus the custom MS Project and forecasting tooling that keeps a model trustworthy at scale.
The work runs greenfield and retrofit, coordinating general contracting, material handling, controls, IT and network infrastructure, robotics and physical security, with safety, government permits and inspections built into the sequence rather than chased at the end.
Disciplines coordinated
Regions
Four ways to bring an integrated planner onto your program. Every one ships with the same toolkit: our interactive Integrated Planning Apps to see and shape the work across floor and schedule, and an AI agent that takes any baselined plan and tracks it to completion, all included.
An integrated planner embedded on your site, in the war room and out on the floor, owning the schedule day to day and keeping every team pointing at the same date. The option for when the project is slipping from the baseline and you need to up the game and claw the date back.
On site where it counts, remote the rest. Milestones, workshops and crunch periods in person; the modelling, forecasting and reporting run remotely between visits.
Full planning and controls run remotely. Your schedule built, optimised and tracked to completion without the travel overhead, with the apps giving you the same visibility from anywhere.
A single deep review of your existing plan: critical path, phasing, risk and cost, with a clear set of moves to recover or protect the date. One engagement, no retainer.
Planning or already running a high-value automation build, and the date or budget is under pressure? Three ways to reach us.